Skip to main content

Brisbane and Gold Coast

Concrete floor sawing for planned slab and pavement cuts.

When a horizontal concrete cut is being planned, the layout, material information and site access matter before a method is discussed.

Method diagramPlanned horizontal-cut discussion.
Service areaBrisbane and Gold Coast
Decision focusHorizontal slab or pavement cut
Start withProject details and access

The short answer

What belongs in a floor-sawing brief?

Floor sawing is the page for a horizontal slab or pavement-cut conversation.

It should not absorb an early-age soft-cut question, a wall opening, a confined hand-cut or a structural wire-saw enquiry. The planned cut and access conditions determine the useful next discussion.

  1. 01

    Slab cut layout

    A planned horizontal slab cut.

  2. 02

    Pavement cut layout

    A planned pavement-cut discussion.

  3. 03

    Pre-cut investigation

    A separate decision where investigation is being considered.

Plan the project question

Start with the cut layout.

The layout, material and work-area conditions frame the conversation.

  1. 01

    Describe the work

    Share the planned cut layout and approximate area.

  2. 02

    Review the work area

    Describe access, interfaces and available material information.

  3. 03

    Keep decisions distinct

    Keep soft cutting, wall work and other methods separate.

  4. 04

    Confirm the next conversation

    Confirm whether another project decision is needed first.

Project situations

Where a horizontal-cut discussion begins.

The final method depends on the actual work and site conditions.

  1. 01

    Slab cut layout

    A planned horizontal slab cut.

  2. 02

    Pavement cut layout

    A planned pavement-cut discussion.

  3. 03

    Pre-cut investigation

    A separate decision where investigation is being considered.

Sirius Concrete Cutters vehicle and specialist equipment on a genuine project site
Genuine Sirius equipmentEquipment and access are planned around the requirements of each site.

Before the first conversation

Send the layout and site details.

Drawings and photos can help explain the planned work.

  • Cut layout and approximate work area
  • Known slab or pavement information
  • Access and nearby interfaces
  • Programme context and available plans

For a useful quote

Send the details that shape the floor-cut discussion.

Start with the cut layout, work area and conditions known to the project.

Location
Suburb, work area and access.
Work
Cut layout and approximate dimensions.
Conditions
Known material and nearby interfaces.
Timing
Programme context and other trades.

Common questions

Floor sawing questions.

Practical answers about a horizontal-cut project brief.

01What information helps with a floor-sawing enquiry?

A cut layout, available dimensions, material information, access details, programme context and site photos or plans where available.

02Is floor sawing the same as soft cutting?

No. Soft cutting is kept as a separate early-age control-joint discussion.

03Should scanning be mentioned?

Yes, if there is a separate pre-cut investigation decision to make.

Plan the horizontal cut

Send the layout and site details.

Start with the information that shapes the method discussion.